Shenyang Lanying International Building Projects Co., Ltd. Supplier Evaluation
Executive Summary
Shenyang Lanying International Building Projects Co., Ltd. is a China-based supplier located in Liaoning, focused on steel structure building products including large-span light steel buildings, steel workshops, prefabricated warehouses, commercial offices, and heavy steel structure buildings. The company shows a solid physical production base, with a reported factory area of 34,000+ m², 110+ staff, and verified supplier status. Its platform profile includes 2 years as a Gold Supplier, Trade Assurance support, response time within 2 hours, and a 100.0% on-time delivery rate. However, commercial validation is limited because past six-month order volume and transaction value are not provided, and customer feedback is based on only one review despite a 5.0 store rating. This supplier appears more suitable for buyers seeking project-based steel structure solutions with moderate-to-large minimum order quantities, while buyers should conduct additional due diligence on transaction history, inspection capability, and customization support before large-scale procurement.

Detailed Analysis
1. Company Strength
Basis
- Factory area: 34,000+ m²
- Employees: 110+ staff
- Verified supplier: True
- Main products: steel structure buildings, workshops, warehouses, commercial offices
- Factory location: Liaoning, China
Elaboration
The supplier demonstrates a relatively strong production foundation based on its reported factory size and workforce. A 34,000+ m² facility suggests meaningful manufacturing space for steel structure building production, while 110+ employees indicate an organized operating scale rather than a very small workshop. The product portfolio is also concentrated in related steel structure building categories, which supports specialization within a defined industrial segment.
Scoring Rationale
The company has stronger-than-basic production indicators, particularly in factory area and employee count. Verified supplier status further improves confidence in its operational legitimacy. However, the available data does not include detailed annual capacity, production lines, machinery, export volume, or factory audit details beyond verified supplier status. Therefore, it fits best as a medium-sized stable factory rather than a fully evidenced large-scale supply chain operator.
Final Score
16 / 20
2. Platform & Compliance Credibility
Basis
- Gold Supplier: True
- Gold Supplier duration: 2 years
- Trade Assurance: True
- Verification: verified supplier marked True
- Platform tags: “Response time ≤2h”, “On-time delivery 100.0%”
- Other certifications: Insufficient Data
Elaboration
The supplier has several important platform credibility indicators, including Gold Supplier status, Trade Assurance support, and verified supplier status. These elements provide a basic level of platform-backed confidence for international buyers. The available tags also show operational performance indicators related to response and delivery.
Scoring Rationale
The core platform credibility elements are present, but the Gold Supplier history is relatively short at 2 years. In addition, the data does not provide evidence of broader compliance certifications, factory audit reports, product certifications, or industry-specific quality certificates. As a result, the supplier has credible platform backing but does not yet demonstrate a fully mature or comprehensive compliance profile.
Final Score
15 / 20
3. Business Performance
Basis
- Past 6-month order volume: Insufficient Data
- Past 6-month transaction value: Insufficient Data
- Store rating: 5.0
- Number of reviews: 1
Elaboration
The supplier has a perfect stated store rating of 5.0, but the review base is extremely limited. More importantly, the two most important transaction indicators—recent order volume and transaction amount—are not provided. This makes it difficult to verify actual market traction or repeat purchasing behavior on the platform.
Scoring Rationale
Although the store rating is positive, one review is not enough to establish strong commercial performance. The lack of disclosed six-month order count and transaction value materially limits the ability to assess demand level, buyer acceptance, and transaction consistency. Therefore, business performance should be scored conservatively due to insufficient commercial validation.
Final Score
10 / 20
4. Service Capability
Basis
- Communication response time: ≤2h
- Platform tag: “Response time ≤2h”
- Full Customization support: Insufficient Data
Elaboration
The supplier’s response time within 2 hours indicates acceptable communication efficiency for international sourcing. This is useful for project-based procurement, where quotations, drawings, technical clarification, and delivery coordination often require timely communication. However, the data does not confirm whether the supplier supports Full Customization.
Scoring Rationale
The response speed is good but does not meet the strongest benchmark of response within 1 hour. In addition, customization capability is not stated, which is a key factor for steel structure building procurement because buyers often require project-specific dimensions, load requirements, drawings, or design adaptation. The supplier therefore shows reasonable service responsiveness, but the lack of customization data prevents a higher score.
Final Score
7 / 10
5. Delivery Performance
Basis
- On-time delivery rate: 100.0%
- Platform tag: “On-time delivery 100.0%”
Elaboration
The supplier reports a 100.0% on-time delivery rate, which is the strongest delivery indicator available in the provided data. For steel structure building projects, delivery reliability is important because delays can affect installation schedules, site labor planning, and downstream construction timelines.
Scoring Rationale
Based strictly on the provided data, the supplier meets the highest delivery performance band because the on-time delivery rate is above 90%. However, the data does not disclose the number of orders behind this percentage, so the score should not assume large-sample reliability. The rating is therefore high, but slightly moderated due to the missing order-volume context.
Final Score
9 / 10
6. Quality & Customer Feedback
Basis
- Store rating: 5.0
- Review count: 1
- Verified supplier: True
- Finished Product Inspection: Insufficient Data
- Factory Verification: verified supplier marked True, but detailed factory verification scope is Insufficient Data
Elaboration
The supplier has a positive customer-facing score of 5.0, but the evidence base is very limited because only one review is available. Verified supplier status provides some quality-related confidence, but no specific quality-control system, finished product inspection process, inspection report, or product certification is provided in the data.
Scoring Rationale
The store rating is strong, but the low number of reviews limits reliability. The presence of verified supplier status supports basic credibility, yet the absence of Finished Product Inspection information and detailed factory verification scope weakens the quality assurance assessment. As a result, the supplier shows some positive signals but does not provide enough data to confirm a mature quality-control system.
Final Score
12 / 20
Total Score
69 / 100
Procurement Recommendation
Cooperation is conditionally recommended for buyers sourcing steel structure buildings, prefabricated workshops, warehouses, commercial offices, or heavy steel structure building projects with minimum order quantities of 500–600 square meters. The supplier appears suitable for project buyers seeking a medium-scale manufacturer with verified supplier status, Trade Assurance support, responsive communication, and strong reported delivery performance.
However, buyers should proceed with additional verification before placing large or technically complex orders. The main risks are insufficient disclosed transaction history, only one customer review, no provided six-month order or transaction data, and insufficient information on Finished Product Inspection, customization capability, detailed factory audit scope, and quality certifications.
The supplier’s growth potential is supported by its factory scale, focused steel-structure product range, verified supplier status, and 100.0% on-time delivery rate. For initial cooperation, buyers should request project references, inspection documentation, technical drawings, quality-control procedures, production capacity details, and a sample contract under Trade Assurance before committing to high-value procurement.
Leave your comment