Foshan Yakai Integrated Housing Technology Co., Ltd. Supplier Evaluation
Executive Summary
Foshan Yakai Integrated Housing Technology Co., Ltd. is a China-based supplier located in Guangdong, positioned in the prefabricated and modular housing segment, with listed products including prefabricated steel structure villas, flat pack houses, detachable houses, and 20/40-foot prefab units. The supplier shows a moderate-to-strong operational profile, supported by a reported factory area of over 10,000㎡, more than 60 staff, and audited supplier status. On , it has 5 years as a Gold Supplier, supports Trade Assurance, and reports a response time of ≤1 hour and 100% on-time delivery. Business performance is commercially meaningful, with 10+ orders and CN¥2.9M+ transaction value over the past six months, although the review base remains limited at 9 reviews. Overall, this supplier appears suitable for buyers seeking prefab housing solutions with medium-volume procurement needs, especially where platform protection, fast communication, and delivery reliability are important. Key due diligence should focus on quality inspection processes, customization capability, and project-specific technical compliance.

Detailed Analysis
1. Company Strength — 20 Points
Basis
- Company: Foshan Yakai Integrated Housing Technology Co., Ltd.
- Country/Region: China, Guangdong
- Factory area: 10,000+㎡
- Employees: 60+ staff
- Audited supplier: True
- Product scope includes prefabricated villas, flat pack houses, detachable houses, and prefab container-type units.
Elaboration
The supplier has a reported factory area exceeding 10,000㎡, which indicates a meaningful physical production base for prefabricated housing products. The employee count of 60+ suggests a medium-sized operation rather than a very large industrial manufacturer. The presence of audited supplier status strengthens confidence that the supplier has undergone some form of factory or supplier verification. Its listed product range also indicates experience in modular and prefabricated housing formats, although the data does not provide detailed production capacity, annual output, equipment lists, or export volume.
Scoring Rationale
The supplier demonstrates a stable medium-scale manufacturing profile. The factory area is relatively solid, and audited supplier status provides additional credibility. However, the employee base is moderate, and there is insufficient data on production lines, monthly output, machinery, engineering team size, or large-scale project delivery history. Therefore, it does not fully qualify as a large-scale, highly proven supply chain under the top scoring band, but it fits well within the “medium stable factory” category.
Final Score
16 / 20
2. Platform & Compliance Credibility — 20 Points
Basis
- Gold Supplier: True
- Gold Supplier duration: 5 years
- Trade Assurance: True
- Certification / platform labels: “Response time ≤1h”, “On-time delivery 100.0%”
- Audited supplier: True
- Formal product/system certifications: Insufficient Data
Elaboration
The supplier has maintained Gold Supplier status for 5 years, which provides a reasonable platform operating history. Trade Assurance support is an important risk-control mechanism for buyers, especially in project-based procurement involving customized or high-value prefab housing products. The supplier is also marked as an audited supplier, adding a level of third-party or platform-based verification. However, the provided certification/industry labels mainly relate to response time and delivery performance. No clearly documented formal certifications, such as independently verified factory management certifications, product compliance certificates, or industry-specific approvals, are provided in the structured data.
Scoring Rationale
The platform credibility is strong due to 5-year Gold Supplier status, Trade Assurance support, and audited supplier status. These elements provide a credible purchasing framework. However, the certification profile is not fully complete based on the available data. Although one product title contains “CE ISO,” this is not sufficient to confirm formal certification because it appears only as part of a product name and not as verified certification documentation. As a result, the supplier scores strongly but below the highest band.
Final Score
17 / 20
3. Business Performance — 20 Points
Basis
- Orders in the past 6 months: 10+
- Transaction value in the past 6 months: CN¥2.9M+
- Store rating: 5.0
- Number of reviews: 9
Elaboration
The supplier has generated more than CN¥2.9M in transaction value over the past six months from 10+ orders. This suggests that the average order value may be relatively high, which is consistent with prefab housing products that usually involve larger-ticket transactions. The 5.0 store rating is positive, but the number of reviews is still limited at 9, which means the customer feedback sample is not yet large enough to provide deep statistical confidence. The order count is moderate rather than high, but the transaction amount indicates commercially meaningful activity.
Scoring Rationale
Business performance is better than basic validation because the supplier has recent transaction activity and a relatively high six-month transaction value. The 5.0 rating supports positive buyer experience, but the low review count limits confidence in broad market validation. The order volume of 10+ is acceptable but not high enough to indicate very large recurring buyer demand. Therefore, the supplier fits the stable medium business performance range rather than the top-tier high-volume category.
Final Score
16 / 20
4. Service Capability — 10 Points
Basis
- Communication response time: ≤1 hour
- Platform label: “Response time ≤1h”
- Full Customization support: Insufficient Data
- Communication efficiency beyond response speed: Insufficient Data
Elaboration
The supplier shows strong response speed, with a stated response time of less than or equal to one hour. This is important for prefab housing procurement because buyers often need quotation clarification, drawings, material details, installation guidance, and shipping coordination. However, the data does not confirm whether the supplier supports Full Customization. Since prefabricated housing projects often require customization in layout, materials, structure, insulation, and local compliance requirements, the lack of confirmed customization capability is a notable information gap.
Scoring Rationale
The supplier deserves a strong service score due to fast response time. However, the scoring criteria require both fast response and strong customization capability for the highest score range. Since Full Customization is not confirmed in the provided data, the supplier cannot be scored at 9–10. The service capability is therefore assessed as good but not fully verified.
Final Score
8 / 10
5. Delivery Performance — 10 Points
Basis
- On-time delivery rate: 100.0%
- Platform label: “On-time delivery 100.0%”
Elaboration
The supplier reports a 100.0% on-time delivery rate. For prefab housing and modular construction products, delivery performance is particularly important because delays can affect construction schedules, site labor planning, container booking, and downstream installation timing. A perfect on-time delivery rate is a strong positive indicator. However, the data does not provide the number of shipments behind this percentage or shipment complexity, so the score is based strictly on the stated rate.
Scoring Rationale
According to the scoring standard, an on-time delivery rate above 90% qualifies for 9–10 points. Since the reported rate is 100.0%, the supplier receives the maximum score for this dimension. No deduction is applied because the provided delivery metric directly meets the highest threshold.
Final Score
10 / 10
6. Quality & Customer Feedback — 20 Points
Basis
- Store rating: 5.0
- Number of reviews: 9
- Audited supplier / factory verification indicator: True
- Finished Product Inspection: Insufficient Data
- Formal quality certifications: Insufficient Data
Elaboration
The supplier has a perfect 5.0 store rating, which is positive. However, the review count is only 9, so the feedback base is relatively small. The audited supplier status supports a basic level of supplier verification and improves confidence in operational legitimacy. That said, the available data does not confirm Finished Product Inspection, detailed quality control procedures, third-party inspection support, defect rate, warranty terms, or documented quality certifications. For prefab housing, quality assurance is critical because structural integrity, weather resistance, assembly accuracy, and material consistency directly affect end-use performance.
Scoring Rationale
The supplier has good visible customer satisfaction based on its 5.0 rating, but the limited review quantity weakens statistical reliability. Factory/audited supplier status provides some quality-related assurance, yet the absence of confirmed Finished Product Inspection and formal quality system details prevents a top-tier score. The supplier fits the “good rating with basic verification” range, rather than the “high rating, large review base, and complete inspection system” category.
Final Score
15 / 20
Total Score
| Dimension | Score |
|---|---|
| Company Strength | 16 / 20 |
| Platform & Compliance Credibility | 17 / 20 |
| Business Performance | 16 / 20 |
| Service Capability | 8 / 10 |
| Delivery Performance | 10 / 10 |
| Quality & Customer Feedback | 15 / 20 |
| Total Score | 82 / 100 |
Procurement Recommendation
Recommendation: Recommended with Due Diligence
Foshan Yakai Integrated Housing Technology Co., Ltd. is a suitable supplier candidate for buyers sourcing prefabricated villas, flat pack houses, detachable houses, and modular housing units, especially where Trade Assurance, fast response, and strong delivery performance are important. The supplier is best suited for small-to-medium project buyers, distributors, contractors, and importers seeking prefab housing products with moderate order quantities and platform-backed transaction protection.
The main risks are the limited number of customer reviews, insufficient data on Finished Product Inspection, unverified customization capability, and lack of clearly documented formal certifications in the provided data. Before placing large or technically complex orders, buyers should request factory audit reports, product drawings, material specifications, quality inspection procedures, certification documents, and previous project references.
Growth potential appears positive due to its 10,000+㎡ factory base, 5-year Gold Supplier history, CN¥2.9M+ recent transaction value, and 100% reported on-time delivery rate.
Leave your comment